PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped Elev. 4-Stair -2 Facing South (800x600).jpg Stripped footings at Elev. 7-Stair -4,5 Facing East (800x600).jpg Stripped footings at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Stripping footings at Elev. 7-Stair -4,5 Facing North (800x600).jpg Stripping footings at Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Waterproofing along L-M line Facing South West (800x600).jpg Waterproofing along L-M line Facing South-West(800x600).jpg
Previous pageNext page Stripping footings at Elev. 7-Stair -4,5 Facing South-East (800x600)
Stripping footings at Elev. 7-Stair -4,5 Facing South-East (800x600)